The asset itself

A campus built to consolidate the entire chip supply chain.

Wafer fabrication, EUV lithography, advanced packaging, and testing — under one roof, on one 12-million-square-foot site in West Texas, for the first time at this scale. Everything below is the physical asset every Terafab FX product is ultimately backed by.

Spec sheet

The numbers.

LocationWest Texas, USA
Total site area12,000,000 sq ft
Cleanroom space2,100,000 sq ft
Power secured1.8 GW
Power mixGrid + on-site solar/gas
Water strategyClosed-loop reclamation
Target monthly output250,000 wafers
EUV tools (planned)40+ systems
Est. jobs at full ramp14,000
Total project cost$40B (est.)

Campus layout

Six buildings, one integrated site.

Hover or tab through each building below — the whole chip supply chain sits on this one campus, which is the entire point of Terafab.

Fab Building — Wafer fabrication, EUV lithography, and cleanroom floors. 1. Fab Building Central Utility Plant — Power distribution, gas systems, and ultrapure water supply. 2. Central Utility Plant Water Reclamation Facility — Recycles process water back into the fab's ultrapure water loop. 3. Water Reclamation Facility Logistics & Packaging Hub — Advanced packaging, testing, and outbound wafer/chip logistics. 4. Logistics & Packaging Hub R&D Annex — Process development and next-generation node R&D. 5. R&D Annex Solar Array — On-site solar generation supplementing the grid power supply. 6. Solar Array
1 Fab Building — Wafer fabrication, EUV lithography, and cleanroom floors.
2 Central Utility Plant — Power distribution, gas systems, and ultrapure water supply.
3 Water Reclamation Facility — Recycles process water back into the fab's ultrapure water loop.
4 Logistics & Packaging Hub — Advanced packaging, testing, and outbound wafer/chip logistics.
5 R&D Annex — Process development and next-generation node R&D.
6 Solar Array — On-site solar generation supplementing the grid power supply.

Where things stand

Construction timeline.

Four phases from ground-break to full production ramp. Status below reflects where the project actually is today, not a projection.

Complete

Site Prep & Foundation

Grading, piling, and foundation pours across the full 12M sq ft campus footprint.

Completed Q2 2025
In Progress

Shell & Cleanroom Fit-Out

Structural steel, cleanroom envelope, and the utility backbone (power, gas, ultrapure water) going in now.

In progress — targeting Q1 2027
Upcoming

Tool Install & Commissioning

EUV lithography and process tools installed, wired in, and qualified line by line.

Targeting Q4 2027
Upcoming

First Wafer & Production Ramp

First qualified wafer out, then a staged ramp toward the 250,000 wafers/month target.

Targeting 2028
41% Construction
68% Series II funded

This is the asset behind every product on the platform.

See how the five investment products map to this same construction and revenue timeline.